PORTFOLIOCompany Projects (Reference List) Previous Next Project: Public Health Relief Building, Ministry of Public Health, Nonthaburi Details: Installed TR 500 KVA 24 kV. Previous Next Project: Chiang Saen Customs House (Port 2), Chiang Saen District, Chiang Rai Details: Installed all manholes Previous Next Project: Chiang Saen Customs House (Port 2), Chiang Saen District, Chiang Rai Details: Installed all HDPE conduit Previous Next Project: Chiang Saen Customs House (Port 2), Chiang Saen District, Chiang Rai Details: Laid concrete tape protection slab and warning tape Previous Next Project: Chiang Saen Customs House (Port 2), Chiang Saen District, Chiang Rai Details: Poured duct bank before the cable pull-box Previous Next Project: Chiang Saen Customs House (Port 2), Chiang Saen District, Chiang Rai Details: Installed manholes and HDPE conduit around the office and evidence-storage buildings Previous Next Project: Chiang Saen Customs House (Port 2), Chiang Saen District, Chiang Rai Details: Transformer pad and installation of an 800 KVA transformer Previous Next Project: Chiang Saen Customs House (Port 2), Chiang Saen District, Chiang Rai Details: Transformer pad and installation of a 250 KVA transformer Previous Next Project: Chiang Saen Customs House (Port 2), Chiang Saen District, Chiang Rai Details: Installed MDB-1, MDB-2, DB21, EDB21 panels Previous Next Project: Chiang Saen Customs House (Port 2), Chiang Saen District, Chiang Rai Details: Terminated cable heads on the riser pole Previous Next Project: Court of Justice, Mueang District, Samut Sakhon Details: Installed TR 100 KVA with MDB panel Previous Next Project: Mae Sot Checkpoint, Mae Sot District, Tak Details: Mae Sot project, Tak Province Previous Next Project: Factory in the Suan Phak area (Ampol Food) Details: Installed TR 1000 KVA Previous Next Project: Chiang Mai Rajabhat University (Dormitory), Hang Dong District, Chiang Mai Details: Installed temporary power TR 250 KVA 22 kV, MDB 400 A panel with cable and accessories Previous Next Project: Chiang Mai Rajabhat University (Lecture Building), Hang Dong District, Chiang Mai Details: Installed temporary high-voltage switchgear TR 250 KVA 22 kV and a temporary 250 KVA 22 kV transformer Previous Next Project: Setthakit Highway Section, Highway District Office, Mueang District, Samut Sakhon Details: Installed MDB 400 A panel with low-voltage cable Previous Next Project: Juvenile and Family Court, Mueang District, Samut Sakhon Details: Installed high-voltage switchgear TR 630 KVA and TR 50 KVA